Product Variety and Lead-Time Analysis in PC Assembly Industry Using Simulation Technique
N.H. Saad
ABSTRACT
Product variety is one of the main market strategies in the mass customisation (MC). The aim of MC is to satisfy individual needs with mass production efficiency. The diversification of product line is very important in today’s business environment, where the customers are from various level of economic status, various ranges of age and have different need on certain product. In broadening product line based on customer requirement, it is analogous to increase relative attractions of the firm’s product portfolio vis-à-vis competition. However, it may give negative effects on the manufacturing performance such as quality, cost, and problems in expediting customer orders. Hence, the main focus of this paper is to analyse the impact of product variety on lead-time. Lead – time is one of the very important performance indicators in measuring the performance of an organization. It is measured between placement of the order in the production until delivery time to customer. In analysing the impact, simulation modelwas built based on the focused manufacturing environment, in the area of Personal Computer (PC) Assembly Industry. The model was simulated using ARENA Simulation Software. Based on the quantitative result of the simulated model, the correlations between product variety and lead – time were analysed and observed.
Keywords: Impact, Variety, lead-time, simulation, PC Assembly Industry
References
[1] Bartezzaghi, E., Spina, G. & Verganti R. (1999). “Lead-Time Models of Business Processes”. International Journal of Production & Operation Management 14(5), 5 -20.
[2] Bertrand, J.W.M. & Van Ooijen, H.P.G. (2000). “Customer Order Lead-Time for Production Based On Lead Time and Tardiness Costs”. International Journal Production Economics, 257-265.
[3] Esther, P.Y.T. & Richard, C.M.Y. (1996). “Product Variety – An Environmental Perspective”. Integrated Manufacturing System 7(6).
[4] Holmstrom, J. (1998). “Handling Product Range Complexity – A Case Study On Reengineering Demand Forecasting”. Business Process Management Journal 4(3), 241-258.
[5] Ishii, K., Juengel, C. & Eubanks, C.F. (1995). “Design For Product Variety: Key to Product Line Structuring”. Proceeding of the ASME Design Engineering Technical Conference 83(2), 499-506.
[6] Jiao, J. & Tseng, M.M. (1999). “A Methodology of Developing Product Family Architecture for Mass Customisation”. Journal of Intelligent Manufacturing 10(1), 3-20.
[7] Jones, R.M. & Towill, D.R. (1999). “Total Cycle Time Compression and the Agile Supply Chain”. International Journal Production Economics 62 (1999), 61 – 73.
[8] Karmarkar, U.S. (1987). “Lot Sizes, Lead-time and in-Process Inventories”. Management Science 33(3).
[9] Kekre, S. & Srinivasan, K. (1990). “Broader Product Line: A Necessity to Achieve Success?” Management Science 36(10).
[10] Kuik, R. & Tielemans, P.F.J. (1999). “Lead Time Variability in A Homogeneous Queuing Model of Batching”. International Journal Production Economics 59, 435- 441. 30 Product Variety and Lead-Time Analysis
[11] Lee, H.L. & Tang, C.S. (1997). “Modelling the Cost and Benefits of delayed product Differentiation”. Management Science 43(1), 40-53.
[12] MacDuffie, J.P., Sethuraman, K. & Fisher M.L. (1996). “Product Variety and Manufacturing Performance - Evidence from the International Automotive Assembly Plant Study”. Management Science 42(3).
[13] Nor Hayati Saad (2000). “Mass Customisation”. Dissertation for MSc in Operation Management and Manufacturing System, University of Nottingham, United Kingdom.
[14] Piroird, F. & Dale, B.G. (1998). “The Importance of Lead-time Control in the Order Fulfilment Process”. Production Planning and Control 7(3), 640-649.
[15] Prasad B. (1998). “Designing Products for Variety and How to Manage Complexity”. Journal of Product and Brand Management 7(3), 208-222.
[16] Ruben, R.A. & Mahmoodi, F. (1998). “Lead Time Prediction in Unbalanced Production Systems”. International Journal of Production Research 38(7), 1711-1729.
[17] Slack, N., Chambers, S., Harland, C., Harrison, A. & Johnston R. (1995). “Operation Management”. Pitman Publishing.
[18] Spearman, M.L. & Zhang, R.Q. (1999). “Optimal Lead – Time Policies”. Management Science 45(2), 290-295.
[19] Tersine, R.J. & Hummingbird, E.A. (1995). “Lead -Time Reduction: The Search for Competitive Advantage”. International Journal of Production & Operation Management 15(2), 8-18.
[20] Tseng, M.M. & Jiao, J. (1998). “Concurrent Design for Mass Customisation”. Business Process Management Journal 4(1), 10-24.
[21] Ulrich, K. (1995). “The Role of Product Architecture in the Manufacturing Firm”. Research Policy, 419-440.
[22] David Kelton, W., Randall Sadowski, P., & Deborah Sadowski, A. (1998). “Simulation with ARENA”. McGraw-Hill International Editions.
[23] Yeh, K.H. & Chu, C.H. (1991). “Adaptive Strategies for Coping with Variety Decisions”. International Journal of Production & Operation Management, 35 -47.
[24] Yucesan, E. & Groote, X.D. (2000). “Lead Times, Order Release Mechanisms, and Customer Service”. European Journal of Operational Research, 118 -130.




